Project Description

Transitional Housing Project at “THE STEP” at Ngau Tam Mei North

Number of MIC: 1400+

Design layers: 4 layers

The construction project is designed and constructed using the construction-assembly synthesis method – steel structure MiC technology, and is located at SAN Tam Road, Ngau Tam Mei, Yuen Long. The project consists of four residential blocks of about 4 storey, each with an en suite bathroom and cooking space, with an estimated capacity of about 1,107 flats and about 2,700 peo